Save this image free of charge in 800 pixels for layout use (right click, Save as...)
|
|
Ref : S05202
Theme :
Space Shuttle - General (1045 images)
Title : After repair of a cracked cleat on the crawlertransporter
Caption :
(10/31/2000) --- After repair of a cracked cleat on the crawler-transporter, Space Shuttle Endeavour finally rests on Launch Pad 39B. To the left is the Rotating Service Structure. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections
|
|